预制电力井模具作为钢模具必须先进行拼接才可以继续应用后,拼接的零件尺寸也要与模具一直不能有任何的误差出现,以免出现拼接程度达不到标准,组装后的模具是两层设计,在两层模具中灌浆的部分开始涂刷机油,目的是进行模具的保护。我厂对于原料的选择不仅是从质量方面进行考虑,还有这模具的价格、使用时限、操作便利等等多方面,如果随便选择一种材料进行生产,不能确保模具的灌浆效果达标。预制电力井模具是双层的设计,内层模具与外层模具尺寸有差别,在生产时需要分开制作。As a steel mold, the prefabricated power well mold must be spliced before it can continue to be used. After that, the size of the spliced parts must not have any error with the mold, so as to avoid that the splicing degree can not meet the standard after assemblyThe mold is designed in two layers. The grouting part of the two layers of mold is painted with engine oil to protect the mold. Our factory not only considers the quality of raw materials, but also the price and cost of the mold
In many aspects, such as time limit, convenient operation and so on, if you randomly select a material for production, you can not ensure that the grouting effect of the mold meets the standard. The prefabricated power well mold is a double-layer design, and the size of the inner mold is different from that of the outer mold
No, it needs to be made separately during production.